Call Get Help
Our work

Before, afterand in between.

Real jobs, photographed by our crew. Every before and after opens half and half. Slide it to see the full before or the full after.

Recent job · Topperwein Dr, Austin
Kitchen make-readyScope: 5 items
  • Cabinets rebuilt, doors rehung & paintedCARPENTRY
  • New countertops, sink & faucetKITCHEN
  • Walls repainted, trim caulkedPAINT
  • New ceiling light fixtureELECTRICAL
  • Final clean + haul-awayTURNOVER
StatusComplete
Before & after21 jobs
Before: kitchen makeready After: kitchen makeready. Cabinets, counters, sink, faucet and lighting brought back to rent-ready.
Kitchen makeready Cabinets, counters, sink, faucet and lighting brought back to rent-ready.
Before: bathroom wall rebuild After: bathroom wall rebuild. Torn-out wall patched, textured and painted. New vanity light, mirror and hardware.
Bathroom wall rebuild Torn-out wall patched, textured and painted. New vanity light, mirror and hardware.
Before: stair carpet install After: stair carpet install. Stripped treads to finished stairs, wrapped and tucked clean.
Stair carpet install Stripped treads to finished stairs, wrapped and tucked clean.
Before: fireplace update After: fireplace update. Dated stacked stone painted charcoal, mantel refinished in gloss white.
Fireplace update Dated stacked stone painted charcoal, mantel refinished in gloss white.
Before: bath refresh After: bath refresh. Fresh paint, matte-black mirror, light bar and fixtures.
Bath refresh Fresh paint, matte-black mirror, light bar and fixtures.
Before: built-in storage After: built-in storage. Broken shelving replaced with new cabinets and a fridge nook.
Built-in storage Broken shelving replaced with new cabinets and a fridge nook.
Before: dining room update After: dining room update. Carpet out, vinyl plank in. New paint and light fixture.
Dining room update Carpet out, vinyl plank in. New paint and light fixture.
Before: frameless shower door After: frameless shower door. Open stall finished with a frameless glass door and new trim.
Frameless shower door Open stall finished with a frameless glass door and new trim.
Before: stair carpet replacement After: stair carpet replacement. Worn carpet out, new pad and carpet in.
Stair carpet replacement Worn carpet out, new pad and carpet in.
Before: stair runner After: stair runner. Stained runner replaced with a woven runner over hardwood.
Stair runner Stained runner replaced with a woven runner over hardwood.
Before: porch column rot repair After: porch column rot repair. Rotted column base cut out, rebuilt and painted to match.
Porch column rot repair Rotted column base cut out, rebuilt and painted to match.
Before: window trim rot repair After: window trim rot repair. Rotted sill trim replaced, caulked and painted.
Window trim rot repair Rotted sill trim replaced, caulked and painted.
Before: gable vent replacement After: gable vent replacement. Open, rotted gable vent replaced and sealed.
Gable vent replacement Open, rotted gable vent replaced and sealed.
Before: wall patch & paint After: wall patch & paint. Anchor holes and scuffs patched, wall repainted.
Wall patch & paint Anchor holes and scuffs patched, wall repainted.
Before: faucet replacement After: faucet replacement. Leaking, corroded faucet swapped for a new two-handle set.
Faucet replacement Leaking, corroded faucet swapped for a new two-handle set.
Before: entry cleanup After: entry cleanup. Beds cleared and trimmed for curb appeal.
Entry cleanup Beds cleared and trimmed for curb appeal.
Before: shrub trim After: shrub trim. Overgrown hedge cut back off the house.
Shrub trim Overgrown hedge cut back off the house.
Before: garage door paint After: garage door paint. Faded white garage door painted to match the rest of the building.
Garage door paint Faded white garage door painted to match the rest of the building.
Before: kitchen sink & faucet After: kitchen sink & faucet. Old faucet out, new pull-down faucet in, sink cleaned up.
Kitchen sink & faucet Old faucet out, new pull-down faucet in, sink cleaned up.
Before: tub surround rebuild After: tub surround rebuild. From backer board and a new tub to finished tile, niche and fixtures.
Tub surround rebuild From backer board and a new tub to finished tile, niche and fixtures.
Before: air filter change After: air filter change. Clogged return filter swapped for a new pleated filter at turnover.
Air filter change Clogged return filter swapped for a new pleated filter at turnover.
Finished & on the job

Want yours to look like the after?

Call us Get help